Verification of new generators trip-off scheme for a long transmission system by EMTP

Danzhen Gu,Qian Ai,Chen Chen,Hui Fu,Changyi Li
2005-01-01
Abstract:Long transmission lines will weaken the electric connection between power plants, which have several generators, and power systems, to which the power plant will provide power. In southeastern of china, there exits the same topological structure. The trip-off scheme of generators in power plant is very rigorous, albeit Fixed Compensation (FC) has been used to promote transient stability. After development in these years, the end-point power gird has been reinforced, so the old scheme should be modified. This paper employs Electromagnetic Transients Program (EMTP) as a simulation tool to verify the new scheme with field tests parameters, and hopes the conclusions can give operators some positive suggestions.