Heuristic procedures for transmission planning in competitive electricity markets

Wene Lu,Ettore Bompard,Roberto Napoli,Xiuchen Jiang
DOI: https://doi.org/10.1016/j.epsr.2006.10.003
IF: 3.818
2007-01-01
Electric Power Systems Research
Abstract:The network structure of the power system, in an electricity market under the pool model, may have severe impacts on market performance, reducing market efficiency considerably, especially when producers bid strategically. In this context network re-enforcement plays a major role and proper strategies of transmission planning need to be devised. This paper presents, for pool-model electricity markets, two heuristic procedures to select the most effective subset of lines that would reduce the impacts on the market, from a set of predefined candidate lines and within the allowed budget for network expansion. A set of indices that account for the economic impacts of the re-enforcing of the candidate lines, both in terms of construction cost and market efficiency, are proposed and used as sensitivity indices in the heuristic procedure. The proposed methods are applied and compared with reference to an 18-bus test system.
What problem does this paper attempt to address?