Rapid Start-up of Integrated Two-phase Anaerobic Reactor for Treating Domestic Sewage

REN Zhen-jie,CHEN Zhi-li,HE Qiang,WANG Wen-biao,XIONG Kai-sheng,WANG Jing-yu,ZHANG Wan-tu
DOI: https://doi.org/10.3969/j.issn.1000-4602.2012.11.007
2012-01-01
Abstract:An integrated two-phase anaerobic reactor was designed to treat domestic sewage,and the corresponding start-up process was investigated.Under 35 ℃ and constant influent quality,the COD volumetric loading rate(VLR) of the system was raised by decreasing HRT,and the start-up process was completed in only 36 days.When the influent pH was 7.39 to 7.67,the acidogenic and methanogenic phase of the reactor were separated using a kinetics method.After completing the start-up process,the reactor operated well.The COD removal rate was more than 80%,the SS removal rate was about 90%,and the gas production rate was about 0.31 L/h.VLR was 1.31 kg/(m3·d) and HRT was about 7 h.