Establishment of the Clinical Engineering and Their Quant Ity Control System of Themedical Equipment

Wei JIN
DOI: https://doi.org/10.3969/j.issn.1002-2376.2008.10.006
2008-01-01
Abstract:This text elaborat es set forth surrounding the hospital clinical medicine project,the armamentarium buying,being put into use,being maintained and so on has managed and a link,has discussed the building-up armamentarium mass under the control of and safe conduct system.
What problem does this paper attempt to address?