Settlement Analysis of Load Rate on the Complex Soil Foundation

王玉海,汤志刚,阎长虹,蔡晶晶,徐杨,邵勇
DOI: https://doi.org/10.16030/j.cnki.issn.1000-3665.2011.05.002
2011-01-01
Abstract:The pile mountain engineering on complex soil foundation area exists two engineering geological problems: settlement of deformation and destruction of shear deformation.These two aspects must be calculated reasonably and scientifically to predict and determine the foundation treatment countermeasures and slope reinforcement.Through calculations and analyses,the project area has a large settlement.In order to reduce the ill effects of settlement to the project,we use stratified rolling filling,and fitting drainage consolidation method to deal with soft soil and packing.In order to guarantee the safety of construction of the project,it is necessary to control the load speed of filled soil,and find out the best heap load speed.The results of analyses in different loading show that when the filled soil heap load time limits for 12 months,the filled soil loading speed can meet the requirements of the safety of the project design.
What problem does this paper attempt to address?