Demonstration on Optimal Operation of O_3/BAC Process

CHANG Ying,HE Tao,QI Wen-guang,LU Shao-ming
DOI: https://doi.org/10.3969/j.issn.1000-4602.2013.13.001
2013-01-01
Abstract:A study on optimal operation of the O3/BAC process was carried out to solve problems such as microfauna growth,a drop in effluent pH and difficult quantification control of O3 dosage in the Pearl River downstream region.The study results,which focused on the acid or alkali in-situ modification of BAC filter and the effluent pH regulation with lime,the O3 dosage and the BAC filter backwashing mode optimization,were employed in a demonstration project with a scale of 100×104m3/d.Since its operation in January 2012,the demonstration project has operated stably.The effluent turbidity and COD Mn were less than or equal to 0.2 NTU and 2 mg/L,respectively,and microbial safety was significantly increased.In the construction of the demonstration project,a guarantee system of advanced purification treatment in this area was built and the operation control system of O3/BAC process was optimized.
What problem does this paper attempt to address?