An Algorithm for Solving the Resource Constrained Project Scheduling Problem

刘敏,代成琴,王宇航
DOI: https://doi.org/10.3969/j.issn.1003-7241.2008.06.004
2008-01-01
Abstract:In this paper,a model of project scheduling with uncertain resource constraints is constructed.The original uncertain problem is converted into an equivalent deterministic programming problem by the chance-constrained programming method.A simple two-stage method is proposed and an example is also presented
What problem does this paper attempt to address?