The Dynamic Response and Failure of Three-Span Continuous Pipe-Beam

GY Lu,JP Lei,SY Zhang
DOI: https://doi.org/10.4028/www.scientific.net/kem.274-276.147
2004-01-01
Key Engineering Materials
Abstract:In this article three-span continuous pipe beams were impacted laterally at the mid-span by a rigid blunt indenter. The pipe failed with plugging failure mode that a hole with the indenter diameter was produced at the wall of the pipe. The time-history curves of impact force were given. The beam-on-foundation were used and modified to simulate the perforation process. The results compared with the corresponding experiments are very identical. Analyses show that the added-mass and the added-damping can be effectively used to reflect the response of the water filled in the tube.
What problem does this paper attempt to address?