Automatic Sequence Switching System for Substation Based on CLIPS

金红核,胡炎,邰能灵,崔鹏程,林尉,袁成,王晶
2010-01-01
Abstract:Currently the automatic sequence switching system has the drawback of generality and flexibility.Based on the prototype of a 500 kV underground substation with property of multivoltage classe and complex connecting,this paper implements an automatic sequence switching system,which is developed by the expert system language CLIPS.The system can reason the accurate operation orders under different main electrical connections and daily operating duties,furthermore,it formats both the first and secondary operation steps directly,which gives great help to new staff on filling the operation tickets.
What problem does this paper attempt to address?