Innovated Engineering Project Management Mode Based on Supply Chain Integration

CHEN Chao
DOI: https://doi.org/10.3969/j.issn.1005-152x.2012.03.013
2012-01-01
Abstract:In this paper,the concept of supply chain integration is introduced to deal with the deficiency of traditional engineering project management modes,on the basis of which the integrated supply chain mode for engineering projects is proposed.A two-layered analysis on the new mode shows that the newly introduced role of engineering project management company as well as the activity connections established between the agents of the system can help avoid some of the short-sighted behaviors and decisions and credit risks problems common to the traditional modes.
What problem does this paper attempt to address?