Study on pre-treatment of the micro-polluted reservoir water by subsurface up and down flow constructed wetland

Yang Xu,Yu Shuili,Liu Shuo,Chen Xiaohong
DOI: https://doi.org/10.3969/j.issn.1002-8471.2010.01.033
2010-01-01
Abstract:The pre-treatment of micro-polluted reservoir water by subsurface up and down flow constructed wetland was carried out.According to experimental data,first order kinetic simulation equations of chemical oxygen demand(CODCr),total nitrogen(TN)and total phosphorus(TP)of the subsurface up and down flow constructed wetland were established.The results showed that when the hydraulic loading was 0.4 m3/(m2·d),the average removal rates of CODCr,TN,ammoniacal nitrogen(NH3-N),and TP in up and down flow constructed wetland were 56.06%,58.97 %,55.91% and 50.56% respectively.Removal efficiency of the system in summer was obvious higher than that in other season.The expenditure of construction of the constructed wetland with the average treating capacity of 3.6 m3/d and 20 years of lifetime would be 2 100 RMB,and the average disposal cost would be summed up to 0.13 RMB/m3,which shows pre-treatment of micro-polluted reservoir water by constructed wetland should be feasible.
What problem does this paper attempt to address?