Constructed Wetland System for Pre-treatment of Yuqing Lake Reservoir Inflow

Yang Xu,Xiaojun Yan
2007-01-01
Abstract:The constructed wetland was used to pre-treat the Yellow River water at the entrance of Yuqing Lake Reservoir.The treatment effects of subsurface-flow constructed wetland and surface-flow constructed wetland were investigated.The results show that when the inflow water rate is 75 L/h,the subsurface-flow constructed wetland and surface-flow constructed wetland both have better purification effects.The average removal rates of COD are 49.17% and 36.58% respectively,and the COD in the outflow water is basically below 20 mg/L.The average removal rates of TN are 52.14% and 43.68% respectively,and the TN in the outflow water is basically below 3 mg/L.The average removal rates of TP are 48.07% and 39.69% respectively,and the TP in the outflow water is basically below 0.08 mg/L.
What problem does this paper attempt to address?