The new Development of Airship used in Power Transmission Engineering

Zhang Bo
DOI: https://doi.org/10.3969/j.issn.1672-6324.2007.04.007
2007-01-01
Abstract:The technology is progressively development to apply airship in power transmission construction. In the "Three Substation and Thirteen Transmission Line Projects" of Yunnan Power Grid, Yunnan Power Transmission & Substation Engineering Co. applies airship draging one pilot line and then draw five lead ropes for pull conductor by each one. Thus, the time is shortened way. It achieves good economic and social benefits.
What problem does this paper attempt to address?