The Research and Implementation of a Scheduling and Simulation System for Semiconductor Production Line

XUE Chenjiang,QIAO Fei,LI Li
DOI: https://doi.org/10.3969/j.issn.1673-1964.2005.03.009
2005-01-01
Abstract:According to the practical demands from the semiconductor production lines, a scheduling and simulation system for semiconductor product line, TB-PSS, is designed and implemented on the platform of SIMUL8. TB-PSS is composed of three sub-systems: the database sub-system, the simulation and scheduling sub-system and the analysis of performance sub-system. The simulation and scheduling sub-system is the most important part of TB-PSS, which uses input data provided by database and policy rules to simulate from the current state of product line in time. The result is a plan that predicts what will happen in the real production line, showed to user by the analysis of performance sub-system. Now, TB-PSS has been applied in a semiconductor product line to assist the manufacture manager in making decision, and has gotten a well feedback.
What problem does this paper attempt to address?