Research on Integrated Dynamic Scheduling Model for Iron and Steel Enterprise

LIU Xiao-bing,WANG Shun-bao,MENG Qiu-nan,BO Hong-guang
DOI: https://doi.org/10.3969/j.issn.1002-2279.2007.02.027
2007-01-01
Microprocessors
Abstract:For solving the problems on macroscopic control and real-time monitoring of iron and steel enterprise in workshop production management,the grading,focusing on key production phase,rule-based fractal scheduling model is presented.The ways in implementation of integrated scheduling are detailed discussed by the scheduling model.In accordance with the above scheduling model,a real scheduling system of iron and steel enterprise is established,which can balance materiel supply between sub factories and reduce the production period and make a optimized scheduling.
What problem does this paper attempt to address?