Application of Test Technology in 500 kV Yushan Smart Substation

LI Xiu-jin,HUANG Wei,YUAN Yu-bo,DENG Jie-qing,QIANG Sheng,GAO Lei,ZHANG Xiao-yi,CUI Xiao-xiang
DOI: https://doi.org/10.3969/j.issn.1009-0665.2010.06.019
2010-01-01
Abstract:As the development of new technologies such as pure optical transformer,IEEE1588 clock synchronization technology,IEC61850-9-2 network construction etc.in recentyears,these new technologies have been preliminarily explored to be applied in some digital substations.It is a prominent problem to systematically evaluate the performance of digital substation.This paper introduces the project's scheme and practical experience of digital interval test in east Suzhou(Yushan substation),proposes the content and measure of the digital substation test,and concludes some problems in the test.