Configuration-based Multiple Design-Projects Rapid Planning for ETO Product

FANG Xiao-fen,JI Yang-jian
DOI: https://doi.org/10.3969/j.issn.1002-2333.2010.12.018
2010-01-01
Abstract:To improve the efficiency of project planning for Engineer to Order(ETO) product design projects in the mass customization mode,a rapid project planning method based on configuration was proposed.Traditional project planning methods performed less efficiently because of the influence of time,resources,and other uncertain constraints in multiple ETO product design projects.A Master Project Work Breakdown Structure(M-WBS) template based on product family was constructed,so as to incorporate sets of time-constraint,resource-constraint and node matching rules.Consequently,application of M-WBS template simplifies complexity of iterative search algorithm comparing with the bound variables of constraints in project planning processes.This method within M-WBS template was applied in multiple ETO product design projects environment to achieve an effective and rapid configuration of projects.Finally,this method was evaluated in ETO parallel-projects environment of an industrial steam turbine enterprise.Multiple design projects of industrial steam turbine were planned successfully.Result illustrates that the method performed feasibly and operationally.
What problem does this paper attempt to address?