Quality Management Method for Concrete in Bridge Engineering

WANG Wen-xue,SONG Wei-guo
DOI: https://doi.org/10.3969/j.issn.1671-7767.2011.04.010
2011-01-01
Abstract:To improve the quality management level of concrete used in bridge engineering,the factors influencing concrete quality,including irrational division of construction sections in the process of bridge construction,the potential deficiencies in the field laboratory of supervision department and the lax control for the quality of raw materials,the concrete mix proportioning and the concrete production process,have been summarized based on practical project experiences.In view of the aforementioned influential factors,it is suggested that the owner should adopt the management methods of unifiedly purchasing materials,inviting bids for commercial concrete mixing plant to produce concrete unifiedly,and introducing the third-party testing inspection agency with independent legal entity to effectively enhance the quality management level of concrete.
What problem does this paper attempt to address?