Preliminary Study on Quota Indices Selection and Quantification for Controlling the Temporary Construction Land Use:A Case Study on Beam Fabricating Yards of High-speed Railway

Hong-qiao DOU,Xiao-bin JIN,Xiao-lu TANG,Yin-kang ZHOU,Chun-zhu SHEN,Xiu-feng SHEN
DOI: https://doi.org/10.3969/j.issn.1001-8158.2010.09.010
2010-01-01
Abstract:The purposes of the paper are to analyze the existing problems on governing temporary land use for construction projects,and to explore the quota indices selection and quantification methods for controlling the temporary land uses.Methods employed include comparative analysis,statistical data analysis and Delphi method.The results indicate that through analysis the methods for selecting indices and quantifying the basic quotas that controls the land use of beam fabricating yard of high-speed railway have been obtained.It is concluded that based on the requirements of engineering techniques and specifications,the basic quota of temporary land use for constructing the high-speed railway and its modification method can be determined with the comprehensive consideration of regional natural conditions,project construction conditions and construction progress arrangement,which can also provide reference point for the standardized governance of other temporary land uses.
What problem does this paper attempt to address?