On Stage of Power Grid Development

HU Lie-xiang,XU Qian,ZHANG Quan-ming,ZHAO Rong-xiang,GAN De-qiang,WU Hao
DOI: https://doi.org/10.3969/j.issn.1007-1881.2011.12.003
2011-01-01
Abstract:The data of electric power consumption per capita and annual electric power consumption of Japan and United Kingdom from 1960 to 2008 are analyzed.Based on Logistic model,this paper proposes that the development of grid will experience four stages,i.e.,early developing stage,developing stage,post-developing stage and saturation developing stage.The division of developing stages of United Kingdom power grid and its construction history of transmission system indicate that the grid construction peak occurs before the turning point of developing and post-developing stages.According to stages of power grid development and Zhejiang grid′s power consumptions at the current state and saturation state,it is inferred that Zhejiang grid will enter the post-developing stage between the end of the Twelfth Five-year Plan period and the beginning of the Thirteenth Five-year Plan period.The stage division provides the basis for decision-making on grid planning,construction,operation and maintenance.
What problem does this paper attempt to address?