Study on Real-time NDT Method Applied in Evaluating the Performance of Karst Cave Treatment in the Course of Construction of Deep Bridge Piles Foundation

LI Zhi-yi,BAI Ming-zhou,XU Zhao-yi,CHEN Xiang,WANG Cheng-liang,GUO Meng
DOI: https://doi.org/10.3969/j.issn.1001-8360.2012.05.015
2012-01-01
Abstract:On the basis of theoretical analysis,combined with construction of the Beijing-Shanghai High Speed Railway bridge pile foundations in the karst area,tests of the seismic wave propagation characteristics were carried out on site.The seismic waves were generated in the course of breaking rocks.By these test data,the seismic wave propagation characteristics of karst caves before and after grouting were researched.The typical features of the karst caves and effect of treatment were found.Seismic reflection tests were made with ground surface seismic wave sources at the same test points.The karst cave known as shallows buried ground surface seismic source was also tested to explore the typical features of the karst cave and grounting effect.On the basis of the three kinds of tests,the test data,such as the characteristics of reflected wave signals,and phase axes,etc,were processed,and the real-time NDT method and indices for discrimination were summarized.
What problem does this paper attempt to address?