Power Transmission System Planning Based on Grey Chance Constrained Programming

ZHAO Guo-bo,LIU Tian-qi,LI Xing-yuan,CHEN Bin
2009-01-01
Abstract:Comparing with traditional power transmission system planning,there are more uncertain factors to be processed during power transmission system planning under electricity market environment.According to the load increasing and grey and stochastic properties of installed capacity of generators,a mathematical model of power transmission system planning based on grey chance constrained programming(GCCP) is built up;the objective function is solved by genetic algorithm(GA) with grey simulation,and optimal power transmission system planning schemes corresponding to different confidence levels are obtained.Analysis on the results of calculation example shows that the planning result obtained by the proposed method is more flexible and adaptable,so the proposed method is available for reference to planning works.