Transmission Safety Margin Constrained Unit Commitment in Power Systems

LEI Xuejiao,PAN Shijuan,GUAN Xiaohong,ZHAI Qiaozhu
DOI: https://doi.org/10.13334/j.0258-8013.pcsee.2014.31.023
2014-01-01
Abstract:For generation schedules considering uncertain wind power resources integrated into power grids, obtaining reasonable power flow is very important to lower the overload risks of transmission lines and increase the system security and robustness. The concepts of transmission safety margin and reserve availability were proposed in this paper, and then a transmission safety margin constrained unit commitment formulation was established. Reasonable cost constraint was added to guarantee that there could be little increase in the operation cost compared with conventional unit commitment. Numerical tests were conducted in terms of transmission safety margin, reserve availability under uncertain wind power output and variation tendency of transmission security margin with generation costs to verify the effectiveness of the method. It turns out that this method can increase the safety margin of congesting or heavy-loaded lines compared with conventional unit commitment model, the reserve availability problem caused by transmission capacity limits can also be effectively avoided and the robustness of the scheduling planes against uncertainty is improved. Thus, a compromise between secure and economic operation can be achieved.
What problem does this paper attempt to address?