Single-machine Scheduling with Job Can Be Processed in Advance

WEI Qi,HE Yong
DOI: https://doi.org/10.3321/j.issn:1008-9497.2006.04.007
2006-01-01
Abstract:A single machine scheduling where jobs can be preprocessed before they are scheduled to the machine is considered.The objective is to minimize the cost for preprocessing under the constraint that no job is tardy.The problem is showed to be NP-hard and a pesudo-polynomial time algorithm is presented.For the case that the costs for preprocessing jobs are the same,a strongly polynomial time algorithm is presented.
What problem does this paper attempt to address?