DESIGN AND CONSTRUCTION PROGRESS OF CYCIAE-100, A 100 MEV H- CYCLOTRON AT CIAE

Tianjue Zhang,Chengjie Chu
2007-01-01
Abstract:As report in the last Cyclotron Conference in Tokyo, a new RIB facility, Beijing Radioactive Ion-beam Facility (BRIF) had been started in CIAE since 2004. In this project, a 100 MeV Hcyclotron, CYCIAE-100 is selected as the driving accelerator. It will provide a 75 MeV ~ 100 MeV, 200 μA ~ 500 μA proton beam. In this paper, firstly the improved design by adopting several suggestions from the Side Meeting for CYCIAE-100 in Tokyo in 2004 will be introduced. Then, the construction progress, including the magnet, the RF system etc. will be described respectively. And some R&D, including the CRM (Central Region Model) cyclotron, LLRF control, 10mA Hsource etc. for this machine will be given too.