Long-term Optimal Scheduling of Large-Scale Hydropower Systems for Energy Maximization

Ming ZHANG,Chengjun LI,Xiaohui YUAN,Qi ZHONG
DOI: https://doi.org/10.3969/j.issn.1671-8844.2007.03.012
2007-01-01
Abstract:An improved discriminant criterion method(IDCM) derived form the discriminant criterion method is presented to solve long-term optimal scheduling operation problem of large-scale mixed hydropower systems.In order to avoid the difficulties arising from calculating the energy index K values of the reservoirs with hydraulics relations in the process,the coordinates rotation method is adopted to transfer the decision-making process for multireservoirs simultaneously to single reservoir alternate gradually.Combining of the routine operation chart rule of hydro plant,which is used to control the storing or dispatching water quantity of the time period in a reasonable bound,the IDCM proposed and the result derived from it is more reasonable.Taking the large-scale hydropower system consisting of eleven hydro plants in the middle-upper Yangtze River basin in China for example,the model of maximizing the energy with firm power of the hydropower system is tested.
What problem does this paper attempt to address?