Estimating Operational Risk of China's Commercial Bank via Improved Monte Carlo Simulation

Jin Ting,Qin Xuezhi
DOI: https://doi.org/10.3969/j.issn.1006-4311.2007.12.004
2007-01-01
Abstract:When estimating operational risk by the Monte Carlo simulation,the time factor is often ignored,and it leads a biggish error.Using the model of GM(1,1)to estimate the frequency of operational risk,building the estimation model of GM(1,1),and modifying the origination point and the residua of the model can get a much more accurate simulation model of frequency.Considering the time factor of the model,it estimates the loss amounts by the Monte Carlo simulation,and the commercial bank can prepare a much more accurate capital,and reduce the loss caused by the operational risk.
What problem does this paper attempt to address?