Optimal multistage modernization of power system subject to reliability and capacity requirements

Gregory Levitin,Anatoly Lisnianski
DOI: https://doi.org/10.1016/S0378-7796(98)00130-8
IF: 3.818
1999-01-01
Electric Power Systems Research
Abstract:This paper addresses the multistage modernization problem for power systems with series-parallel structure. The study period is divided into several stages according to demand forecast. At each stage the consumer demand distribution is predicted in the form of a cumulative load curve. Different actions, such as modifying existing equipment, changing maintenance policy, or adding new elements, may be undertaken in any system component at any stage to increase the total system capacity and/or reliability. The objective is to minimize the sum of costs of system modernization actions over the study period while satisfying reliability constraints at each stage. In order to solve the problem, a genetic algorithm is used as an optimization tool. The solution encoding technique developed allows the genetic algorithm to manipulate integer strings representing multistage system modernization planes. A solution quality index is comprised of both reliability and cost estimations. The procedure based on the universal generating function is used for evaluation of the availability of multistate series-parallel power systems. This technique allows one to estimate the effect on the entire system availability when both capacity and availability of system elements are varied. An illustrative example is presented in which the optimal expansion plan is found for a coal transportation system of a power station. (C) 1999 Elsevier Science S.A. All rights reserved.
What problem does this paper attempt to address?