Structure Optimization of Power System with Bridge Topology

G Levitin,A Lisnianski
DOI: https://doi.org/10.1016/s0378-7796(98)00019-4
IF: 3.818
1998-01-01
Electric Power Systems Research
Abstract:The problem of optimization of a power system structure which cannot be reduced to series or parallel combinations is considered. The system contains a bridge substructure in which redundant elements are included in order to provide a desired level of reliability. The elements of the system are characterized by their capacity, availability and cost. A procedure which determines the minimal cost system configuration subject to reliability constraints is proposed which provides solutions with different structure topology. In this procedure, system elements are chosen from a list of products available on the market. System reliability is defined as the ability to satisfy consumer demand which is represented as a piecewise cumulative load curve. To evaluate system reliability, a universal generating function technique is applied. A genetic algorithm (GA) is used as an optimization technique. Examples dealing with the determination of the optimal structure of a power station coal transportation system are presented for problems with different constraints.
What problem does this paper attempt to address?