Optimization of Underground Metal Mine Production Plan Based on Heterogeneous Data Integration Technology

Yao Xulong,Hu Nailian,Liu Dabin,Li Guoqing
DOI: https://doi.org/10.3969/j.issn.1001-1250.2012.11.032
2012-01-01
Abstract:All information produced by The 3D mining software containing reserves,grade,three-dimensional block model of the stope,the stope geological reserves management information systems,equipment management information systems,human resources management information system and production acceptance management information system were integrated into a unified production planning optimization platform by the data interface.The relevant data were heterogeneously aggregated and deeply processed.The multi-objective optimization model based on production quotas and indicators of grade was established to achieve the automatic optimization of mine production plan,and to provide a scientific basis for the plan.
What problem does this paper attempt to address?