Study on partial block casting tests of immersed tunnel

LUO Yao,WANG Shengnian,YUAN Yong
DOI: https://doi.org/10.3969/j.issn.1002-3550.2013.07.005
2013-01-01
Abstract:Hong Kong-Zhuhai-Macao immersed tunnel is the first tunnel in China precasted in factory and few empirical approaches can be used for reference.Controlling and avoiding early age thermal cracking in concrete is a key technology to guarantee the construction quality of the project,and small block tests should be carried out to study the basic performance of concrete,cracking control measures and temperature indexes in different season.Through two small block tests.It studied the basic properties of concrete in different mix ratio,and verified the effectiveness of cracking control measures such as mixing ice,formcloth,curing film and gridingcloth.Furthermore,temperature indexes in different season were obtained through monitoring.All of the works provided some value for the 1/4 quarter full-scale segment tests in future.