Size and Effect of Step Length in Pedestrian Underpass

WANG Zhida,GONG Xiaonan
DOI: https://doi.org/10.3969/j.issn.1001-7119.2009.06.024
2009-01-01
Abstract:In the construction of the pedestrian underpass of underground cutting with shallow embedded,it is crucial to rationally delimit the size of step length.If the size of step length is too small,the construction time will be prolonged.If the size is too large,the earth on the top of the tunnel will be unstable,even collapse.Combined with a underpass in Hangzhou,with FLAC3D numerical analysis,study on step length of underpass in silty sand is simulated in this paper.It shows that the number of subsidence of surface got from the numerical calculation is the same as the real situation.This study offers a basis for the further similar construction.
What problem does this paper attempt to address?