The analysis of 35kV/2kA HTS cable system site installation, trial and operation fault

Bo Hou,Feng Ye,Juan Wu,Min Tan,Anlin Ren,Haixia Xi,Ying Xin
DOI: https://doi.org/10.16711/j.1001-7100.2006.04.016
2006-01-01
Abstract:35kV/2kA high temperature superconductor(HTS) cable system was developed successfully,and operated in the power grid in Kunming Puji 220kV substation in April 2004.This paper introduced the installation and test of Puji HTS cable system,summarized the operation status,and analyzed the fault and limitation in an operation period.The installation,test and operation management of Puji HTS cable system could adapt to related criterions of power industry.Under the grid control,the HTS cable system had transmitted power energy about 1.6 hundred million kilowatt-hours.