The price adjustment mechanism of PPP project based on satisfaction of participants

李启明,熊伟,袁竞峰
DOI: https://doi.org/10.3969/j.issn.1671-511X.2010.01.003
2010-01-01
Abstract:PPP projects have a long operation period.The changes of the PPP projects will inevitably lead to the adjustments of prices and subsidies.Based on the balance of the tripartite(the public sector,the private sector and the general public) satisfaction mechanism,a dynamic price and subsidy model for PPP projects was structured.At first,the tripartite critical objectives system and the feedback mechanism of critical objectives were identified.Then,by using system dynamics,the inside reflection model of these project objectives was established.Finally,the adjustment mechanism of pricing was designed to the satisfaction of all stakeholders.
What problem does this paper attempt to address?