Discussion on application of a combined chilled ceiling and underfloor air supply system in an office building

Wang Yuping,Lian Zhiwei
2008-01-01
Abstract:The design procedures of a combined chilled ceiling and underfloor air supply system was discussed through a design project of an office building in Shanghai. The initial electrical installation capacity and total energy consumptions in cooling season of the combined system was compared with that of the conventional system. The results indicated that the initial electrical installation capacity of the combined system can be reduced by 16%~34% and the total energy consumptions can be reduced by 18%~41% as compared with that of the conventional system in cooling season.
What problem does this paper attempt to address?