Analysis of 1000 MW-Grade Supercritical Boiler Starting System

CHEN Ye,FAN Hao-jie,LIU Jin-sheng,ZHANG Ming-chuan
2008-01-01
Abstract:In Shanghai Saigaoqiao No.2 Power Plant and Huaneng Yuhuan Power Plant,the Boilers are all 1 000 MW-grade supercritical units.Although the starting systems are the internal separating system,there are some differences in the type choice and constitute of the starting system.In this paper,the two starting systems were described,and the differences were analyzed.The aim is to provide information for the type choice of the starting system in large-capacity supercritical unit.