Pretreatment of Wastewater in Amine C Acid Manufacture by Coagulation-Catalytic Oxidation

Gao Qiangli,Chen Jianlin,Yao Sanli,Qi Kai,Liu Longmao
DOI: https://doi.org/10.3969/j.issn.1006-1878.2008.03.014
2008-01-01
Abstract:Wastewater in amine C acid manufacture was pretreated bycoagulation-catalytic oxidation.The effects of coagulant dosage,wastewater pH,oxidant dosage,reaction time and catalyst reuse times on the wastewater pretreatment were investigated.The optimum process conditions were determined as follows:10% FeSO4 solution used as coagulant and with dosage 250 mL/L,1% ClO2 solution used as oxidant and with dosage 75 mL/L,Ni/AC used as catalyst and with dosage 40g/L,reaction time 60 min.Under these conditions,the COD removal is 78.4%,BOD5/COD is increased from 0.076 to 0.292 improving greatly the wastewater biodegradability.The activity of the recycled Ni/AC catalyst is remained stable after 7 times of reuse.Based on the initial economical evaluation,the cost of treating 1 t of wastewater is about $16.