Influence of Pile Group Loading on the Crown Settlement of Three-Centered Circle Tunnel and Treatment

JIANG Qing-qing,YANG Yan-ping,CAO Ping,HUANG Xiao-yang,CHEN bing-jie
DOI: https://doi.org/10.3969/j.issn.1672-7029.2012.06.007
2012-01-01
Abstract:By the use of finite element program MIDAS/GTS,the weak soil strata in Shenzhen metro line 5 was used to analyze the ingort which the pile groups lood had on the three-centred horseshoe shaped tunnel,and the influence of tunnel vault displacement due to the pile groups layout and the distance between piles and tunnel was also studied.The results show that the crown settlement of tunnel line reduce with the increase of pile space and distance between pile and tunnel,and the influence of the vertical pile distance is less than the parallel pile distance.The influence of the pile length is related to the burying depth of tunnel,while the crown settlement of tunnel increases with the increase of the ratio of length and burying depth of tunnel.The terminal of pile in the same depth with the tunnel should be avoided so as not to engender the maxmium displacement.The crown settlement of tunnel decreases with the increase of the length of shelter pile and the distance between shelter pile and tunnel the ratio of shelter pile length and tunnel burying depth being over 1.2 may bring a better effect.
What problem does this paper attempt to address?