A Methodology for Determining the Concession Period of BOT Highway Projects under Uncertainty of Revenue

王东波,宋金波,戴大双,李铮
DOI: https://doi.org/10.3969/j.issn.1003-5192.2010.02.011
2010-01-01
Forecasting
Abstract:Concession period is one of the most important issues through the concession agreement of build-operate-transfer(BOT) projects,and has been the focus in fields of both academy and practice.Through the review of relevant literatures on influencing factors and decision methods for concession period,several key risks including construction period,construction cost,traffic volume,price and operation and maintenance cost are concluded.Each risk is measured with a kind of probability distribution function according to the practical regulations,and further income function and cost function are established respectively.According to the results of Monte Carlo simulation to construction period,construction cost and net present value in the operation period,a reasonable interval of concession period could be determined at required rate of return on investment,and a case study is provided to demonstrate the application of the proposed methodology and simulation techniques.It provides a referential methodology for determining the concession period of BOT highway projects under uncertainty of revenue.
What problem does this paper attempt to address?