Abstract:Concession period is one of the core provisions in franchise contract. However, previous literatures that study on concession period have not considered the effect of investor's reference point of revenue. This paper discusses a new decision making method on the concession term for BOT projects to improve the current decision method. Basing on assumptions that the project company is loss-averse and its opportunity utility is the reference point, we set up a Stackelberg game model. The optimal solution of concession period is applied in a numerical example. It shows that the higher the private investor' s expectation, the longer the concession term should be.