On Scheduled Operations of Bus Rapid Transit

Wang Yang,Chen Xiaohong,Yang Chao,Xu Jia
DOI: https://doi.org/10.3969/j.issn.1007-869X.2009.03.008
2009-01-01
Abstract:The planning and construction of bus rapid transit (BRT) is one of the most effective ways to implement public transportation priority,and many cities in China are promoting BRT now.The scheduled operation is one of the most important part of BRT system,which reflects the characteristics and service level of BRT.In order to determine the goal of the scheduled operation,this paper makes a qualitative analysis of the relationship between public transportation and passenger's travel time,takes the change coefficient of service interval as an indicator to reflect the reliability of BRT;then makes a quantitative analysis of the relationship between the change coefficient of service interval and the average waiting time of passengers,thus the maximum acceptable waiting time according to the investigation data is gained.Finally,this paper proposes the maximum utilization of public transport facilities as the goal of the scheduled operation,and the docking failure rate as a measure of the utilization of facilities. In this way,the control objectives of change coefficient of service interval in different regions can be calculated.
What problem does this paper attempt to address?