Analysis and countermeasures of water producing in Shu1 ultra heavy oil reservoir

Wen Qing-zhi
2007-01-01
Abstract:Shu1 area of Shuguang oilfield has abundant ultra heavy oil reserves and is an important production superseding block of Liaohe oilfield.Water production of different degree occurs during development process in this area because of geological and engineering factors,and has seriously affected oil well production and block development result.This paper studies the type and reason of water production,analyzes its impact on ultra heavy oil development,and proposes maneuverable technical countermeasures in conjunction with geological characteristics of Shu1 area.Field application shows that these measures have effectively reduced the adverse effect of water producing,and achieved good response.
What problem does this paper attempt to address?