The Safety Evaluation of the Structure of Existing Subway Station above Shielding Tunnel Traversing

Tao Lianjin,Xu Youjun,Wang Wenpei
DOI: https://doi.org/10.3969/j.issn.1673-0836.2010.z1.042
2010-01-01
Abstract:The evaluating method of the structure safety of the existing subway station when shielding tunnel traverse under it was put forward,involving risk identification,risk evaluation and risk control.Taking a project under construction as an example,the risk rank of the station was posed,and by means of numerical simulation,the displacement of station structure was predicted,its security was analyzed,and control indicators were recommended. The results indicate that the risk rank of the station structure is the highest,the rank of the structure safety is of gradeⅠ,control indicators of the displacement include the maximum value of bottom settlement 15mm,and the longitudinal deformation ratio is 3‰.