THE EXPERIMENTAL STUDY ON FAST CULTIVATING OF GRANULAR SLUDGE WITH EXPANDED GRANULAR SLUDGE BED

Liu Yongfeng,Zhou Xingqiu,Wu Jiandong
2008-01-01
Environmental engineering
Abstract:The fast cultivating of granular sludge with expanded granular sludge bed(EGSB)was studied.The anaerobic reactor inoculated sludge from UASB reactor,with floc sludge 80% and anaerobic granular sludge 20% whose diameter was less than 0.8 mm.The experimental results showed that the apparent granular phenomenon appeared in the anaerobic reactor after 35 days'operation,and the average diameter of the granular sludge was up to 1.4 mm,the distribution of the diameter was even and the medium diameter(1~2 mm)accounted for 61.84% by weight.When the influent COD was 7 500 mg/L,the volume loading rate 52 g/m3·d,the hydraulic retention time 3.2 h,the recycled ratio 12,the upflow velocity 3.4 m/h,the reactor could run stably and the removal rate of COD was up to 95.4%.And under the above condition,the granular sludge increased quickly when the MLSS of the reactor stabled at 45 g/L or so through discharge proper sludge,and the MLSS could be up to 65 g/L after 4-5 days.
What problem does this paper attempt to address?