Simulation and Research in Aerial Work Platform Electro-hydraulic Proportional Leveling System Based on Matlab

WANG Xin,SONG Xiaoguang,TENG Rumin,WANG Yihua,ZHAO Fuling
DOI: https://doi.org/10.3969/j.issn.1001-3881.2008.04.054
2008-01-01
Abstract:The structure and principle of electro-hydraulic proportional leveling system were introduced.The models of electro-hydraulic proportional control system were established.The simulation results were given and the factors influence its dynamic characteristics were analysed based on GTBZ-30 type thirty meters aerial work platform under Matlab/Simulink circumstance.
What problem does this paper attempt to address?