Design and Practices on Coal Reserves Management and Information System Based on GIS

ZHANG Peng-peng,MAO Shan-jun
DOI: https://doi.org/10.13199/j.cst.2009.07.106.zhangpp.035
2009-01-01
Abstract:There were separation to each other between reserve report data and seam floor contour line as well as reserve calculation drawing,relying on manual calculation and data filling problems existing in coal reserve management information system.Base on detail analysis on the reserve management code of production mine,the paper provided design plan of coal reserve management information system base on GIS.The paper discussed key problems of diagram operation platform,reserve calculation and date generalized management.The practice application of system in Shendong Branch of Shenhua Group showed that system could meet daily reserve calculation,mapping,report preparation and other requirements in mine and could improve work efficiency of reserve departments in mine.
What problem does this paper attempt to address?