Control Method of Concurrent Operation for Dismounting and Assembling Simulation in Cooperative Maintenance

周思杭,刘振宇,谭建荣
DOI: https://doi.org/10.3785/j.issn.1008-973x.2012.12.001
2012-01-01
Abstract:To effectively resolve concurrent operation during process of virtual maintenance of the same object and accomplish cooperative dismounting,a concurrency control method of coordinating operation was proposed.The joint linkage matrix including information of joint type and joint axis is created in order to accomplish the preprocessing of assembly model.According to the judgment of conflict source,which consists of assembly model,assembly unit,property sort and property value,the concurrency operation is subdivided and the concurrency control process is established.Concurrency control methods based on the adaptive motion of assembly unit are used to deal with the concurrency operation on the assembly model with deadlock joints;while considering the assembly model without deadlock joints,the concurrency control methods based on the degree of manipulation ramification are applied.The engine assembly simulation by the concurrency operation,which includes assembling the piston-cylinder rod-crankshaft with multi-joint to cylinder,was applied to prevent unsuccessful assembling because of assembly interference.
What problem does this paper attempt to address?