Design of Rapid Treatment Process of Urban Road Rainwater Runoff
WU Guang-xue
2011-01-01
Abstract:Aimed at the characteristics of large instantaneous volume and high-pollution load of urban road rainwater runoff,a new rapid treatment process was designed,and the reduction efficiency of rainwater runoff load in the process was investigated.The process includes two stages: first flush runoff storage and cyclone filtration.According to the local rainwater characteristics and the related design standard,the designed storage tank can store the first flush runoff effectively.The experimental results show that SS is removed mainly in the cyclone,with the corresponding removal rate of 36%,while pollutants can be removed by filtration,with the corresponding removal rates of 95% for SS,50% for COD,80% for NH3-N,30% for TN,and 70% for TP.The rapid treatment process can control the road rainwater runoff pollution effectively.
What problem does this paper attempt to address?