Demonstration Project of Constructed Rapid Infiltration System for Water Treatment of the Daqing River

LI Chao,HOU Chenglin,WU Weizhong,ZHU Qing
DOI: https://doi.org/10.3969/j.issn.1674-5906.2010.12.033
2010-01-01
Abstract:A Constructed Rapid Infiltration(CRI) system was developed as a demonstration to reduce the pollutants entering Lake Dianchi through Daqing River.The operation was divided into six stages to optimize the working conditions based on the pollutant removal efficiency,according to the different climate conditions,influent qualities and operation conditions.The results indicated that the optimal pollutants removal ability can be reached under the operation conditions of hydraulic loading of 2 m·d-1 and 1:1 wet/dry cycle.The CRI system had a strong ability to remove organic matters and the average COD removal efficiency was between 17.42% and 63.75%.The ammonia removal was from 56.71% to 85.48%,depending on the influent quality.The CRI system had a higher nitrification capability,while lower denitrification capability.The average TN removal ratio was between 10.69% and 28.29%.The average TP removal ratio was 27.62%,with highest of 50.23%.It is suggested that the aerobic biodegradation in unsaturated zone and anaerobic biodegradation in saturated zone could be enhanced by increasing the height of saturated zone and controlling the wet and dry cycle in a reasonable range.
What problem does this paper attempt to address?