Cutoff Effect of Groundwater Seepage Due to Existence of Underground Structure

XU Ye-shuang,SHEN Shui-long,MA Lei
DOI: https://doi.org/10.3785/j.issn.1008-973x.2010.10.010
2010-01-01
Abstract:A three-dimensional finite element model was established to analyze the cutoff effect of groundwater seepage due to the existence of underground structure.The model was an integrative model by considering groundwater seepage and soil consolidation.The groundwater seepage was simulated in three-dimensional condition,and the compression of soil layers was calculated in one-dimensional consolidation based on Terzaghi consolidation theory.Numerical results indicate that the degree of this kind of impact depends on the depth and width of the underground structures penetrated into the aquifer.The drawdown of groundwater level and land subsidence at the lower side of the underground structure increases with the increase of the inserted depth of the wall in soil,and increases with the increase of the width of the wall.
What problem does this paper attempt to address?